The brief for this 3 week project calls for a bus shelter suitable for the countryside.
After functional requirements, cost & sustainability was the main considerations of this project, as it was imperative that rural councils with limited funding would be able to afford it. Local materials and workmanship were used to bolster the local economy & foster sustainability.
After functional requirements, cost & sustainability was the main considerations of this project, as it was imperative that rural councils with limited funding would be able to afford it. Local materials and workmanship were used to bolster the local economy & foster sustainability.

